Greenland Place has 697 flats in nine blocks. This is where flat owners and leaseholders come together to share information, coordinate on service charges, building safety and insurance, and have a say in how Greenland Place is managed. Register as an owner to see updates, meeting minutes and ways to take part.

For flat owners and leaseholders. Our volunteers check each registration request.

The Development

Around 2005 Lewisham Council began work on a single masterplan for the land to the east of Plough Way, covering Cannon Wharf and the neighbouring Marine Wharf developments, with this being adopted as part of the Lewisham Core Strategy in June 2011, with planning consent for Canon Wharf approved in 2012.

The development was undertaken by Barratt London transforming a former industrial and commercial site into a residential estate comprising nearly 700 homes, commercial premises and associated facilities. Barratt only appear to have become involved from January 2013, though it is assumed they would have been working in the background with Lewisham assisting in the original planning permission.

1. The original site and ownership

Before redevelopment

The land was registered at HM Land Registry under title number TGL269356, with the address recorded as Insulcrete Works, London SE8 5DT, which seems to have been a business that occupied the site from the 1950s and was still in occupation during the early 2000 when Lewisham Council were first looking to redevelop the area.  The 3 hectares (7.4 acres) site subsequently became associated with the Cannon Wharf Business Centre at 35 Evelyn Street, SE8 5RT, though also comprised some industrial and warehouse buildings, an open-sided warehouse facilities and extensive surface car parking.

The land was formally acquired by BDW Trading Limited, part of the Barratt Developments group, for residential redevelopment on 14 February 2014, Barratt paying £49.26 million to acquire the freehold.

In October 2018, Barratt sold the freehold to Adriatic Land 8 (GR1) Limited for £6.56 million.

2. Planning permission – Cannon Wharf (2012)

The original planning permission was granted by Lewisham Council on 30 March 2012.

The principal application reference was: 08/68523 – Cannon Wharf Business Centre, 35 Evelyn Street, SE8.

The permission provided for:

The scheme was identified in Lewisham’s 2012/13 Annual Monitoring Report as a joint development involving London Business Centres and Barratt.  

3. Development and launch of Greenland Place (2013–2014)

Barratt subsequently marketed the development under the name Greenland Place.

In September 2013, Barratt London formally launched residential sales.

The original marketing described a development of 562 private apartments, comprising five lower-rise buildings and two taller towers (then advertised as 19 and 22 storeys).

The first completions were anticipated from June 2014, with the overall development expected to be completed by July 2018.  

The Land Registry information shows the initial sales and ownership arrangements with new business centre sold (prior to construction) in January 2013 based on 999 year lease. 40 flats in Mandara Place were sold on a 155–lease to L&Q and the first flats in Norlem Court were sold on a 999-year lease basis from October 2014, with other flats in Mandara Place sold on a similar basis from November 2014.

4. Amendments to the planning permission (2015–2016)

The original planning permission was subsequently amended.

In particular, an amendment in 2016 increased the total number of residential units from 679 to the current 697.

The additional accommodation was accompanied by approximately 6,500 square metres of commercial space, including shops, restaurants, a gym and the business centre.  The development also incorporated landscaped areas and pedestrian connections to Evelyn Street and Rainsborough Avenue.  

5. Construction and completion (2013–2019)

Construction commenced in August 2013 with the existing Cannon Wharf Business Centre initially remaining operational while other parts of the site were demolished and redeveloped.

The business centre was subsequently reconstructed, opening in early 2016.

There was also a significant site remediation programme. In 2016, specialist contractor Cognition undertook remediation and drainage works on one of the development parcels.

Earlier investigations had identified elevated concentrations of lead, hydrocarbons and other contaminants in the made ground, including contamination associated with redundant underground storage tanks.  

Lewisham Council’s 2017/18 Annual Monitoring Report records Greenland Place as complete, providing 697 dwellings and approximately 6,500 square metres of commercial accommodation.  

The final phase of affordable (shared ownership and social rent) units were sold to L&Q in January 2017, also on a 155-year lease, and the energy centre serving the communal heat network sold to E.ON in March 2017.  The last of the flats sold on a 999-year lease basis in Gothenburg Court were sold in April 2018, with only the balance of car-parking spaces remaining, which seem mostly to have been sold by Barratt prior to October 2018 when the site was finally sold to Adriatic.